CASE STUDY: 9 5/8’’ External Patch Tie-Back for E.ON

Reinstatement of the 9 5/8" offered E.ON the ability to drill ahead with their planned completion without compromising the integrity of the 9 5/8” casing


ETF Houston, HETS-ZIBs Presentation

READ_ETF Houston 15-16 Oct 2009_final.pdf

Expandable Technology Forum, Houston

The BP Valhall Field – 2/8 G7 Zonal Isolation

Jeroen Nijhof, BP Norge AS

Fraser Louden, READ Well Services Ltd


CASE STUDY: ISO-qualified Casing Patch Achieves Gas-Lift Slot Recovery

READ's Unique as 9 5/8 External Casing Patch is installed in North Sea well