Case Studies
CASE STUDY: 9 5/8’’ External Patch Tie-Back for E.ON
Reinstatement of the 9 5/8" offered E.ON the ability to drill ahead with their planned completion without compromising the integrity of the 9 5/8” casing
Fri, 19 Feb 2010
ETF Houston, HETS-ZIBs Presentation
READ_ETF Houston 15-16 Oct 2009_final.pdfExpandable Technology Forum, Houston
The BP Valhall Field – 2/8 G7 Zonal Isolation
Jeroen Nijhof, BP Norge AS
Fraser Louden, READ Well Services Ltd
Wed, 25 Nov 2009
CASE STUDY: ISO-qualified Casing Patch Achieves Gas-Lift Slot Recovery
READ's Unique as 9 5/8 External Casing Patch is installed in North Sea well
Sat, 01 Aug 2009