Our Publications
Latest News
READ exhibiting at SPE North Sea Stimulation and International Deepwater Drilling Conference

READ Well Services Ltd will be taking part in the SPE North Sea Stimulation Workshop and International Deepwater Drilling Conference & Exhibition this week and early March respectively
Mon, 22 Feb 2010
READ Well Services Celebrates HETS External Patch tie-Back Success at Babbage
READ is pleased to announce the successful deployment of its Hydraulic Expandable Tubular System (HETS) – External Patch (EP) Tie-Back system in the Babbage B2Z Well in the Southern North Sea region.
Wed, 17 Feb 2010
Cased Hole Senior Maintenance Technician / Supervisor Vacancy
READ Well Services is looking for an Experienced Senior Cased Hole Maintainance Technician / Supervisor
Thu, 19 Nov 2009
Case Studies
CASE STUDY: 9 5/8’’ External Patch Tie-Back for E.ON
Reinstatement of the 9 5/8" offered E.ON the ability to drill ahead with their planned completion without compromising the integrity of the 9 5/8” casing
Fri, 19 Feb 2010
ETF Houston, HETS-ZIBs Presentation
Expandable Technology Forum, Houston
The BP Valhall Field – 2/8 G7 Zonal Isolation
Jeroen Nijhof, BP Norge AS
Fraser Louden, READ Well Services Ltd
Wed, 25 Nov 2009
CASE STUDY: ISO-qualified Casing Patch Achieves Gas-Lift Slot Recovery
READ's Unique as 9 5/8 External Casing Patch is installed in North Sea well
Sat, 01 Aug 2009
News Archive
CASE STUDY: 9 5/8’’ External Patch Tie-Back for E.ON
Reinstatement of the 9 5/8" offered E.ON the ability to drill ahead with their planned completion without compromising the integrity of the 9 5/8” casing
Fri, 19 Feb 2010
ETF Houston, HETS-ZIBs Presentation
Expandable Technology Forum, Houston
The BP Valhall Field – 2/8 G7 Zonal Isolation
Jeroen Nijhof, BP Norge AS
Fraser Louden, READ Well Services Ltd
Wed, 25 Nov 2009
CASE STUDY: ISO-qualified Casing Patch Achieves Gas-Lift Slot Recovery
READ's Unique as 9 5/8 External Casing Patch is installed in North Sea well
Sat, 01 Aug 2009
